CN104268051A - Server complete-computer pressure testing method - Google Patents
Server complete-computer pressure testing method Download PDFInfo
- Publication number
- CN104268051A CN104268051A CN201410556896.1A CN201410556896A CN104268051A CN 104268051 A CN104268051 A CN 104268051A CN 201410556896 A CN201410556896 A CN 201410556896A CN 104268051 A CN104268051 A CN 104268051A
- Authority
- CN
- China
- Prior art keywords
- testing
- server
- iwvss
- license
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a server complete-computer pressure testing method. The server complete-computer pressure testing method comprises the steps of configuring a server according to testing contents; installing an operating system; preparing testing tools Intel Windows Validation Stress Suite: iwVSS2.5.1.exe and license.key, installing iwVSS, and installing the license in an installation folder; running the testing tools to perform testing. The server complete-computer pressure testing method is suitable for various service platforms, uses maximum configuration pressure to test and detect whether the server can adapt to the performance and stability under various loads so as to confirm bearing capability of the system, and can effectively and rapidly perform system verification, timely find bug related to the stability on a board card and know the part having problem during quick log positioning through the tools so as to perform debugging.
Description
Technical field
The present invention relates to a kind of method of testing of server complete machine pressure.
Background technology
Along with the development of IT field technology, conventional informationization service and increasingly powerful cloud computing service are more and more higher to the safe and reliable requirement of server.As server product provider, a server all needs to carry out stability test to product in development or production phase; And the stability of server not only will show on single parts, more to show on whole server system.And can server keep long-time normal running under heavy load, can become Client application the prerequisite of stable operation.
Summary of the invention
The technical problem to be solved in the present invention is: this method of testing provides a kind of pressure test technology, can be used for the whole development of server.
Test purpose: detect server with maximum configured pressure test and can adapt to performance under various load and stability, with the holding capacity of certainty annuity; Discovery board upward stability is early correlated with bug.
Content measurement is divided into:
Stress 1 (S1): mainly mainboard basic function (health status) is verified, do not configure any exterior PC IE adapters, but will be fully loaded with all plates carries equipment interface, as USB SATA SAS Ethernet;
Stress 2 (S2): to the pressure test of all storage I/O, fully loaded hard disk (SSD/SAS/SATA/) and various storage adapters, without the need to configuring any network.
The technical solution adopted in the present invention is:
A method of testing for server complete machine pressure, according to content measurement, configuration server; Installing operating system, setup test instrument Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, installs iwVSS, under license is put into installation folder; Testing results instrument is tested.
As follows for S1 testing procedure:
1) server does not configure any outside PCIE device, and namely do not insert any outside adapter, only check-out console carries; The 1G network interface that each plate carries simultaneously configures the client end of 3 1G sub-networks, and 10G network interface configures the client end of 2 10G sub-networks; Com port connects upper loopback connector; USB 3.0 is equipped with the USB3.0 disk of prestissimo instantly, the disk of 2.0 outfits 2.0;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) the hit testing tool window upper left corner " File ", select " Open ", select " Grantley_v0_1.pkx " under " iwVSS/Grantley/ " path, " Grantley " (finding the pkx file of corresponding platform) is selected in " Configuration " drop-down menu, S145 is selected under Flow drop-down menu, bottom of window sets the path exporting log, and click Run testing results after Reconfigure, test process continues 48H.
As follows for S2 testing procedure:
1) fully loaded CPU, internal memory, HDD, all I/O slot collocation storage adapter, without the need to configuring serial ports, network, USB driving-disc, all PCIE slot configure SAS Adapter;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) select the pkx file of corresponding platform, select S2, Reconfigure under Flow drop-down menu, because the test of this rank mainly carries out storage checking, so need disable MEM and network, then click Run testing results, test process continues 48H.
Described method test by standard is:
1), after test terminates, testing tool can generate in corresponding log, log without reporting an error;
2) to delay machine, video frequency output Hua Ping etc. without OS;
3) in BMC log, nothing reports an error or warning;
4) in system log without error;
5) device bandwidth is without remarkable reduction.
Note before testing results upgrading BIOS, BMC, CPLD FW to latest edition, stamp the device drives such as necessary chip after OS is installed, BIOS NUMA is set to the state of ON, the path generating log is set under instrument.
Can beneficial effect of the present invention: this method of testing is applicable to various service platform, detect server with maximum configured pressure test and adapt to performance under various load and stability, with the holding capacity of certainty annuity; Can carry out system verification fast and effectively, discovery board upward stability is early correlated with bug, and the parts gone wrong by the corresponding log quick position that instrument obtains are to carry out debug.
Embodiment
Below in conjunction with specific embodiment, the present invention is further described:
A method of testing for server complete machine pressure, according to content measurement, configuration server; Installing operating system, setup test instrument Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, installs iwVSS, under license is put into installation folder; Testing results instrument is tested.
As follows for S1 testing procedure:
1) server does not configure any outside PCIE device, and namely do not insert any outside adapter, only check-out console carries; The 1G network interface that each plate carries simultaneously configures the client end of 3 1G sub-networks, and 10G network interface configures the client end of 2 10G sub-networks; Com port connects upper loopback connector; USB 3.0 is equipped with the USB3.0 disk of prestissimo instantly, the disk of 2.0 outfits 2.0;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) the hit testing tool window upper left corner " File ", select " Open ", select " Grantley_v0_1.pkx " under " iwVSS/Grantley/ " path, " Grantley " (finding the pkx file of corresponding platform) is selected in " Configuration " drop-down menu, S145 is selected under Flow drop-down menu, bottom of window sets the path exporting log, and click Run testing results after Reconfigure, test process continues 48H.
As follows for S2 testing procedure:
1) fully loaded CPU, internal memory, HDD, all I/O slot collocation storage adapter, without the need to configuring serial ports, network, USB driving-disc, all PCIE slot configure SAS Adapter;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) select the pkx file of corresponding platform, select S2, Reconfigure under Flow drop-down menu, because the test of this rank mainly carries out storage checking, so need disable MEM and network, then click Run testing results, test process continues 48H.
Described method test by standard is:
1), after test terminates, testing tool can generate in corresponding log, log without reporting an error;
2) to delay machine, video frequency output Hua Ping etc. without OS;
3) in BMC log, nothing reports an error or warning;
4) in system log without error;
5) device bandwidth is without remarkable reduction.
Claims (4)
1. a method of testing for server complete machine pressure, is characterized in that: according to content measurement, configuration server; Installing operating system, setup test instrument Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, installs iwVSS, under license is put into installation folder; Testing results instrument is tested.
2. the method for testing of a kind of server complete machine pressure according to claim 1, is characterized in that, as follows for S1 testing procedure:
1) server does not configure any outside PCIE device, and only check-out console carries; The 1G network interface that each plate carries simultaneously configures the client end of 3 1G sub-networks, and 10G network interface configures the client end of 2 10G sub-networks; Com port connects upper loopback connector; USB 3.0 is equipped with the USB3.0 disk of prestissimo instantly, the disk of 2.0 outfits 2.0;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) the hit testing tool window upper left corner " File ", select " Open ", select " Grantley_v0_1.pkx " under " iwVSS/Grantley/ " path, " Grantley " is selected in " Configuration " drop-down menu, S145 is selected under Flow drop-down menu, bottom of window sets the path exporting log, and click Run testing results after Reconfigure, test process continues 48H.
3. the method for testing of a kind of server complete machine pressure according to claim 1, is characterized in that, as follows for S2 testing procedure:
1) fully loaded CPU, internal memory, HDD, all I/O slot collocation storage adapter, without the need to configuring serial ports, network, USB driving-disc, all PCIE slot configure SAS Adapter;
2) Windows 2008 or 2012 OS is installed, preparation tool Intel Windows Validation Stress Suite:iwVSS 2.5.1.exe and license.key, iwVSS is installed, under license is put into installation folder;
3) select the pkx file of corresponding platform, select S2, Reconfigure under Flow drop-down menu, because the test of this rank mainly carries out storage checking, so need disable MEM and network, then click Run testing results, test process continues 48H.
4. a kind of method of testing of server complete machine pressure according to claim 1,2 or 3, is characterized in that, described method test by standard is:
1), after test terminates, testing tool can generate in corresponding log, log without reporting an error;
2) without OS delay machine, video frequency output flower screen;
3) in BMC log, nothing reports an error or warning;
4) in system log without error;
5) device bandwidth is without remarkable reduction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410556896.1A CN104268051B (en) | 2014-10-20 | 2014-10-20 | A kind of method of testing of server complete machine pressure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410556896.1A CN104268051B (en) | 2014-10-20 | 2014-10-20 | A kind of method of testing of server complete machine pressure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104268051A true CN104268051A (en) | 2015-01-07 |
CN104268051B CN104268051B (en) | 2016-11-30 |
Family
ID=52159574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410556896.1A Active CN104268051B (en) | 2014-10-20 | 2014-10-20 | A kind of method of testing of server complete machine pressure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104268051B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105700979A (en) * | 2016-01-12 | 2016-06-22 | 浪潮电子信息产业股份有限公司 | CPU pressure test automatic test method |
CN109660422A (en) * | 2018-12-03 | 2019-04-19 | 郑州云海信息技术有限公司 | Network interface card bandwidth test method, apparatus, terminal and storage medium based on multi-process |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6412106B1 (en) * | 1999-06-16 | 2002-06-25 | Intervoice Limited Partnership | Graphical system and method for debugging computer programs |
CN104052632A (en) * | 2014-05-29 | 2014-09-17 | 汉柏科技有限公司 | Device automation testing method and device based on virtual serial port servers |
-
2014
- 2014-10-20 CN CN201410556896.1A patent/CN104268051B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6412106B1 (en) * | 1999-06-16 | 2002-06-25 | Intervoice Limited Partnership | Graphical system and method for debugging computer programs |
CN104052632A (en) * | 2014-05-29 | 2014-09-17 | 汉柏科技有限公司 | Device automation testing method and device based on virtual serial port servers |
Non-Patent Citations (1)
Title |
---|
张宁东: "《校企合作工学结合新课程体系改革与实践:国家示范性高等职业院校教改成果》", 30 April 2009, 广西科学技术出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105700979A (en) * | 2016-01-12 | 2016-06-22 | 浪潮电子信息产业股份有限公司 | CPU pressure test automatic test method |
CN109660422A (en) * | 2018-12-03 | 2019-04-19 | 郑州云海信息技术有限公司 | Network interface card bandwidth test method, apparatus, terminal and storage medium based on multi-process |
CN109660422B (en) * | 2018-12-03 | 2022-03-22 | 郑州云海信息技术有限公司 | Network card bandwidth testing method, device, terminal and storage medium based on multiple processes |
Also Published As
Publication number | Publication date |
---|---|
CN104268051B (en) | 2016-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10929260B2 (en) | Traffic capture and debugging tools for identifying root causes of device failure during automated testing | |
US7555676B2 (en) | Systems and methods for providing remotely accessible in-system emulation and/or debugging | |
US9158661B2 (en) | Enhanced debugging for embedded devices | |
TWI759423B (en) | Automated test equipment, automated test equipment (ate) apparatus and method of capturing and reporting communications information for failure analysis | |
US9396200B2 (en) | Auto-snapshot manager analysis tool | |
CN107077412B (en) | Automated root cause analysis for single or N-tier applications | |
CN103973515A (en) | Network card stability testing method | |
US20160026451A1 (en) | Automated Operating System Installation on Multiple Drives | |
CN104484274B (en) | A kind of internal memory taking turn audit function method of testing based on ITP instruments | |
US9274174B2 (en) | Processor TAP support for remote services | |
CN104268052B (en) | A kind of Memory Rank Spare method of testing based on ITP instrument | |
CN104375910A (en) | Automated startup and shutdown testing method | |
CN104317690A (en) | Memory Demand Scrub testing method based on ITP (integration test platform) tool | |
CN107832179A (en) | A kind of PCIe Error Enabling method of testings | |
CN106681878A (en) | Method for testing PCIE channel bandwidth | |
CN103257922B (en) | A kind of method of quick test BIOS and OS interface code reliability | |
CN103729221A (en) | Method and device for writing BIOS debugging information into hard disk | |
CN105138438A (en) | MEMORY PATROL SCRUB testing method | |
US9916273B2 (en) | Sideband serial channel for PCI express peripheral devices | |
US11921604B2 (en) | Evaluating system recovery using emulated production systems | |
CN104268051B (en) | A kind of method of testing of server complete machine pressure | |
CN104035850A (en) | Verification method for memory bandwidth and pressure gradual-change parallelism | |
CN104765668B (en) | A kind of method for verifying nfs server stability | |
WO2021056913A1 (en) | Fault locating method, apparatus and system based on i2c communication | |
Lei et al. | Optimizing post-silicon conformance checking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |